Project Overview
Terminal Capacity of 140,000 to 172,000 bpd
The mechanical scope of work was comprised of:
- 50,000 man hours 14,782 linear feet of 8”pipe average NPS;
- Installation of new crude oil processing piping system;
- Crude oil sampling system;
- Crude oil vapour collection and destruction system;
- Compressed air system for controls;
- Instrument air, and air tools;
- Hot water system for showers, eyewashes and wash down water;
- Oil Water separators; and
- Loading Rack Terminal Building ventilation system for 31 railcar crude loading facility.
The electrical scope of work was comprised of:
- Electrical room main power distribution;
- Three power distribution switchracks;
- Three i/o cabinets inside the Loading Rack Terminal Building;
- One i/o cabinet at the strainer area;
- One PLC cabinet in the electrical room;
- VCU control panels in the electrical room; and
- Instrument wiring, heat grounding an automation system.