Brine Pond Liner Replacement
Project Locations:
- Hardisty, Alberta
Strike Divisions:
- Industrial Services
Project Overview:
Remove and replace the existing liner and leak detection system in a 20-acre Brine Pond.
Scope:
- Remove and replace the existing liner and leak detection system in the Brine Pond. 77,000 M2 material for each layer x 3 layers.
- Remove and replace the leak detection system, along with 1100m of perimeter fencing.
- Haul all material off-site to landfills for disposal.
- Maintained a day and night shift working 20 hours per day with no days off for approx. 100 days in a row to meet client deadlines while managing snow, high winds and rains throughout execution.