Project Overview
The Didsbury B7 Compressor Station Unit Addition Project consisted of installing a 30-megawatt (MW) Siemens SGT-A35-GT61 DLE turbine with an RFA-36 Compressor Unit, and auxiliary equipment. Primary scope of work for the unit addition was offsite modularization to enhance on site construction schedule
Compressor Station consisted of 39 modules which included:
- 530,000 kgs of steel fabricated & assembled
- 58,000 FDI’s of piping fabricated
- 3452 Linear Meters of pipe installed, hydrotested & coated
- Majority of Pipe Installation is 48″ NPS with 26.2 mm WT
- Installation of Cable tray, Instrument cabling & Heat trace
- Installation of Building Shells
- Pre-commissioning